garoo remodels

Friday, December 30, 2005

Lawn Status - 12/30/05

Lawn Status - 12/30/05

Determine rent price.

Outside
Make Signs & put in front yard and out by N. 2nd.
Have Wigton do the gravel (Spring)

Screened In Porch
Paint Outside of LR door - Brown (or wash) whichever looks decent and is quick
Get area indoor/outdoor carpet as we won't paint floor.
Repair the window with the duct tape
(For fun get a Knocker? - Is there a door bell, if so check it)

Living Room
Vacuum out the heat vent really well - remove that piece of carpet.


Dining Room
Fix window Screen
Vacuum out the floor heat vent really well - remove that piece of carpet.

Kitchen
Replace Outlet covers
Paint top of door arches
Put up smoke detector

Bath
Caulk around molding where needed
Replace Outlets & covers
Put up toilet roll holder & towel holder
Put on new blind

Hall
Clean wood Trim at tippy top

Hall to basement
Put Second Coat of paint on
Put remaining matching piece of linoleum at landing
Put Finish Strips on the stairs & landing
Paint Steps going down
Finish painting door white

Bed #1
Vacuum out the heat vent really well - remove that piece of carpet.

Bed #1 Closet

Bed #2

Bed #2 Closet
Plane down closet door and remove carpet


Stairs Up
Dust with Mr. Clean

Drawered Hall Closet

Hall Closet
Cut a piece of carpet.
Clean with Mr Clean

Basement
Check on the leak by the water heaters (roto rooter)
Paint floor
Touch Up wall paint by floor so you can't see run marks.
Paint Stairs going down the basement

Garage
Tenant will not get garage. It will be a possibility in the spring however for $25 additional a month.

0 Comments:

Post a Comment

<< Home